SOA Charters
HomeTrips & RatesPhotosReportsReviewsBlogAbout Us

FeaturedArrow Right

My TripsArrow Right

Arrow Left

    Contact
    SOA Charters
    Home
    Trips & Rates
    Photos
    Reports
    Reviews
    Blog
    About Us
    Learn More
    Combo Trips
    Fishing License
    Things To Do
    My Trips
    Bay Salmon Fun
    Pink Fin Fun
    Salmon Crab Fun
    Crab Charter
    Albacore Hunt
    Lingcod Thrill
    Salmon Pursuit
    Shad River Fun
    River Salmon Fun
    Crab Haul Bay
    Halibut Hop
    King River Rush
    Tuna Time
    Bay Bonanza
    Bass Blast
    Rock Leader Fun
    Bay Striper Fun
    Umpqua Bass
    Steel Rush
    Bay Rock Grab
    Whale Watch
    Halibut Hoedown
    Rock Crab Catch

    Winchester Bay Lingcod Fishing - Non-Stop Action with SOA Charters

    • Published Date: November 12, 2025
    • Offshore, Fishing
    • display locationOregon
    • $100 - $2,700 price range
    • Updated Date: November 13, 2025
    • See All Available Trips
    Winchester Bay Lingcod Fishing - Non-Stop Action with SOA Charters

    Winchester Bay Lingcod Fishing - Non-Stop Action with SOA Charters

    Angler holding large flatfish catch on wooden dock at Winchester Bay with boats in background

    Great flatfish action at Winchester Bay! Perfect adventure fishing spot.

    Two anglers displaying large lingcod catch at marina dock in Roseburg OR

    Nice lingcod pulled from the waters around Roseburg! Great day on the water despite the mixed weather.

    Angler holding fresh caught lingcod on boat deck with fishing net and ocean background at Winchester Bay

    Nice lingcod from Winchester Bay! Great adventure on the water today.

    Two anglers displaying caught rockfish and lingcod at boat dock in Roseburg OR

    Nice mixed bag of rockfish and lingcod today!

    Travis Marsh
    Travis Marsh
    Meet your Captain Travis Marsh
    4.9/529 Reviews
    Oregon
    • Top Rated Fishing Guide out of Winchester Bay, OR
    Book A TripCopy Link

    Tyler's crew strikes gold with steady Lingcod bites all day!

    Non-stop bites all day long! Tyler and their crew joined us for a fall afternoon trip that started around midday with partly cloudy skies and some morning rain clearing out. The water conditions set up perfectly for our long leader rock fishing adventure out of Winchester Bay. We had five anglers ready to target some quality Lingcod on our Shared Trip: Long Leader Rock Fishing in Winchester Bay with SOA Charters.

    Once the stage was set, we focused on long leader fishing techniques combined with deep-water fishing and bottom fishing methods. The Lingcod were cooperative throughout the afternoon, and Winchester Bay continues to produce excellent results for this type of offshore fishing. The combination of our techniques and the productive waters around Winchester Bay made for steady action. We wrapped up the trip with great catches and everyone had a solid day on the water!

    This Trip is One Click Away

    If you're looking to get out on Winchester Bay for some quality offshore fishing, our Winchester Bay Charter and Shared 5 Hour Charter Trip Long Leader Rockfish continues to be one of our most popular options. The long leader rock fishing technique we use has been producing consistent results, and the Lingcod fishing out of Winchester Bay remains excellent through fall. Whether you're an experienced angler or new to deep-water fishing, our shared trips offer a great way to experience what Winchester Bay has to offer. The combination of bottom fishing and long leader techniques gives anglers the best shot at quality Lingcod, and our five-hour format provides plenty of time to work the productive offshore areas. Contact SOA Charters to book your Winchester Bay fishing adventure - the Lingcod fishing continues to be hot and our shared trips fill up quick during prime season!

    1 Catch

    Lingcod

    Lingcod

    Catch - 1

    Species Family : Ophiodon Elongatus

    Habital : Onshore

    Weight : 25 - 85 Pounds

    Length : 20" - 60""

    WEATHER

    November 12, 2025
    November 12, 2025
    Temperature

    53.3°F

    Feels 53.1°F
    High Low Temp

    65°F

    45.7°F

    High Low Temp

    65°F

    45.7°F

    Winds

    16.1MPH

    Gusts 24.2 MPH
    SOA Charters

    SOA Charters

    Ready to reel in adventure on the Oregon Coast? Book your Oregon fishing charter with SOA Charters today and experience the best salmon and halibut fishing with Captain Travis Marsh — where every trip is a fun-filled catch!

    Navigate

    • Home
    • Trips & Rates
    • Company
    • Guides
    • Top Fishing Spots on the Oregon Coast – SOA Charters
    • Fishing Species
    • FAQ
      • Reports
      • Reviews
      • Photos
      • Contact

      STAY CONNECTED

      Contact Us

      FacebookContact Us
      Powered by Guidesly

      © Copyright 2026. All rights reserved.Terms of Service.Privacy Policy.Sitemap

      ×